Waiver Auditing & Subcontractor Draw Software · AIA G702/G703 · 12 States
Catch Pay App & Lien Waiver Errors in 60 Seconds.
Pre-check AIA G702/G703 math, state-required lien waivers, and COIs before cutting checks or submitting pay apps — eliminating billing holds before draw submission.
Includes your first 3 pay apps free upon signup · No credit card required.
Dual-Mode Privacy: ephemeral processing for free/sub scans; encrypted project ledgers for commercial accounts.
Drop 1 PDF — Combined Packet or Waiver / AIA / COI
Combined PDFs auto-cut & sort during audit · Up to 10 MB
Studio Walkthrough
Inspect Every Draw Package Before Disbursement
Select a workflow below to inspect how WaiverAudit processes single pay apps, batch binders, and statutory exceptions.
Upload individual waivers, invoices, and COIs to flag payment shortfalls, date gaps, and missing endorsements—then draft the correction email in one click.
Upload individual waivers, invoices, and COIs to flag payment shortfalls, date gaps, and missing endorsements—then draft the correction email in one click.
Note: Audit processing wait times are accelerated for demonstration.
Workflow
Three Steps From Subcontractor Binder to Clean Draw
Upload Your Draw Packet
Drop single waivers, invoices, AIA G702/G703 sheets, and COIs—or upload a combined multi-sub PDF binder up to 50 MB per document.
Automatic Pay-App Reconciliation
AI document extraction reads every uploaded form—then deterministic parity checks verify Line 8 amounts, Line 7 prior payments, state waiver wording, and sub-tier supplier exposure down to the penny.
Export Compliance Verdict
Review a clear Hold or Approved breakdown and download a stamped PDF Audit Certificate for your lender or project file.
Verification Matrix
5-Document Compliance Parity Engine
Upload a Current Lien Waiver plus any combination of Invoice, AIA G702/G703, Prior Unconditional Waiver, and ACORD 25 COI.
Current Statutory Waiver
- Consideration matches invoice & Line 8 to the cent
- Mandatory state statutory wording & font rules
- Notary jurat check (MS § 85-7-433, WY § 29-10-101)
- Conditional vs. unconditional progress type match
Subcontractor Invoice
- Net Due reconciled against Waiver & G702 Line 8
- Retainage percentage math & billing period checked
- Sub-tier vendor & supply-house extraction (> $5k)
- Secondary joint-check risk classification
AIA G702 / G703
- G703 Col G Grand Total == G702 Line 4 (±$0.01)
- Change order diagnostic (Line 4 - Col G == Line 2)
- Line 6 - Line 7 = Line 8 net current payment math
- Line 7 reconciled against prior unconditional waiver
Prior Unconditional Waiver
- Enforces the Two-Waiver Rule for monthly releases
- Confirms prior cleared funds match G702 Line 7
- Verifies prior through-date precedes current draw
- Confirms unconditional release execution & signer
ACORD 25 COI
- Policy effective & expiration dates active at draw date
- General Liability limits verified against GC thresholds
- CG 20 10 Additional Insured endorsement check
- Workers' Comp & Waiver of Subrogation flags
Commercial Draw Controls
AIA G703 Continuation Math & 2nd-Tier Supplier Defense
G703 Schedule of Values Rollup
COL G == LINE 4Multi-page continuation sheets often carry conflicting subtotal rows. WaiverAudit isolates the terminal cumulative Grand Total and validates it against G702 Line 4 within ±$0.01.
- Ignores intermediate per-page footers cleanly.
- Pinpoints unitemized Line 2 change order variances.
- Separates gross work completed from net earned when retainage is withheld.
Sub-Tier Materialman Defense
THRESHOLD > $5,000Unpaid supply houses and rental yards create direct 2nd-tier lien exposure even when prime subs sign releases. WaiverAudit surfaces itemized vendors for secondary clearance.
- Flags major supply houses and equipment rentals above $5,000.
- Layer 3 secondary waiver intake per subcontractor draw.
- Clear tri-state risk status before issuing joint checks.
Statutory Engines
12 Statutory Lien Waiver Jurisdictions
4 statutory forms · strict compliance
A.R.S. § 33-1008
4 mandatory forms · retainage notice
Civ. Code §§ 8132–8138
Statutory progress & final forms
Fla. Stat. § 713.20
12pt bold warning · 90-day clock
O.C.G.A. § 44-14-366
Advance waivers void · cleared funds
M.G.L. c. 254 § 32
4 conditional & unconditional forms
MCL § 570.1115
Mandatory Notary jurat · 60-day clock
Miss. Code § 85-7-433
Residential & commercial waiver rules
RSMo § 429.016
Mandatory notice block · 4 forms
NRS § 108.2457
Chapter 53 forms · HB 2237 compliant
Prop. Code § 53.284
SCR tie-in · conditional/final forms
Utah Code § 38-1a-802
Title 29 forms · Notary jurat seal
Wyo. Stat. § 29-10-101
Other U.S. jurisdictions run in Generic Compliance mode with full AIA G702/G703, invoice, and ACORD 25 parity checks.
Security & Custody
Dual-Mode Document Handling
Temporary Audits vs. Project Records
One-off and credit-pack audits automatically clear uploaded files after completion. Commercial project plans store organized draw history in private, encrypted jobsite workspaces.
Stamped PDF Audit Certificates
Completed audits export downloadable PDF reports with a tamper-evident verification stamp and an exact discrepancy breakdown for lender and internal audit files.
Unlimited Named Team Seats
Every company plan supports unlimited project accountants, PMs, and controllers with individual logins, role permissions, and attributable review history.
Transparent Licensing
Division 01, Subcontractor Plans & GC Licensing
Division 01 Per-Project
Single-jobsite compliance workspace eligible for Owner approval under CSI Division 01.
- 250 audits per calendar month
- Single and Batch draws (100 draws per batch)
- Unlimited authorized team members
- $0 Permanent Read-Only Vault
Subcontractor Plans & Pay As You Go
Pre-flight draw verification before submitting pay apps and waivers to your GC.
- 20 audits/mo ($99/mo) or 50 audits/mo ($149/mo)
- $19 Pay As You Go credit (never expires)
- Single draws
- Full 5-document & AIA G702/G703 parity
Standard GC
Built for commercial GCs managing concurrent jobsites and monthly binder uploads.
- 4 active project slots
- Unlimited named team members
- Single and Batch draws (100 draws per batch)
- 250 audits per included or added slot per quota month
- AIA G702/G703, waiver and insurance checks
- Tamper-evident SHA-256 certificates
- Free read-only project history
Compliance Playbooks
Built for Project Accountants, Controllers & Commercial GCs
Conditional vs. Unconditional & Two-Waiver Rule
Month-by-month progress draw release protocol reconciling Line 8 conditional waivers and Line 7 prior unconditional releases.
ACORD 25 & ISO Endorsement Audit
Verify CG 20 10, CG 20 37, CG 24 04, and CG 20 01 endorsements plus active policy dates before authorizing draw payouts.
Pre-Flight Audit vs. Payment Portals
How WaiverAudit compares to GCPay, Oracle Textura, and Built when you need instant verification without portal lock-in.
50-State Waiver Guide: Statutory vs. Common-Law
Check all 50 US states for mandatory statutory templates, MS & WY physical notary jurats, and Texas HB 2237 rules.
Division 01 Owner Reimbursement Guide
Contract language and cost-isolation rules for billing project-dedicated compliance passes as reimbursable Division 01 jobsite costs.
AIA G702/G703, Privacy & Audit FAQ
Answers on integer-cent math parity, sub-tier materialman defense, Dual-Mode Document Privacy, and billing rules.
Stop approving construction draws on manual spreadsheet checks.
Your first 3 audits run for free in the studio — no credit card required.